Schedule Configuration
Introduction
BIMXtra Role
Requires Superuser or Schedule Edit Config role to access.
Schedule Configuration is a key area in your BIMXtra project setup that determines many behaviours and aspects and should be given appropriate consideration.
Please ensure you take note of Schedule column configuration rules.
Schedules are configured in two main places:
The schedules that are to be used on the project, and some formatting settings are configured in the project configuration > components / schedules section:
The schedule configurations themselves are then set in project configuration > Schedules menu.
Components / schedules section
Schedule Selection
Turn the Schedules On/Off for the current project.
Default schedules are provided for many categorisations and you can configure which of those schedules you want to use and have visible.
The grouping and Names of the schedules can be configured in the Customisation Menu.
Design schedule
Use this tool to bulk copy all schedule configurations from another project into your current project.
Select a project and click Apply to copy all schedule configurations.
Use Reset to revert schedule configurations back to default.
Schedule column configuration rules
The following rules and conditions must be adhered to for correct BIMXtra behaviour across the system:
Mandatory columns
** IMPORTANT Mandatory column visibility requirement is removed in v3.10 and columns can now be turned off if preferred **
There are 6 columns that are mandatory for various automatic functions of the system to be fully operational. These columns may be turned off in the schedules, if functionality is not required.
These columns affect, and are referenced by automated parts of the system e.g.:
COBie export references all these values in its export file creation.
Forms can be defined that pick up these data elements from objects and the construction page has these fields as filters.
Insight can refer to these objects for loading and highlighting.
O&M pages refer to these fields to structure and filter uploaded docs via the upload wizard.ri
Location Data lists used in Forms
The column's FriendlyName and Headers can be edited as required in your projects.
The Mandatory Fields are:
System - defines the system which can be seen and highlighted in Insight
Name
Number
Building
Level
Department
Reserved UserFriendlyName values
** IMPORTANT **
Each schedule column can be given a user defined UserFriendlyName. Each UserFriendlyName must be unique in the schedule.
Please do not use the following for your UserFriendlyName values:
Any BIMXtra System Name of a schedule column, as listed in the first column of the .xls schedule config file.
Any System Information name as seen in the Insight Object Data Tab (category 6). These include:
Category
Easting
Handle
Materials
Model
Name
Northing
The schedule configuration .xls is checked on upload and will fail if any of these values, or any duplicate values, are used.
Admin controlled columns
** IMPORTANT **
Schedules also contain system reference fields that are presently not able to be edited by super users. If you require an edit to these fields please submit an action request to the Clearbox Support team, detailing the server, project, schedule and column you would like edited.
Examples include:
PurposeCode
Schedules Menu
Layout / configuration menu
The layout/configuration page allows general schedule changes and provides a preview of the configured schedule.
In general, the method to configure schedules is:
Select the Schedule to edit
Edit the Properties of the schedule via the properties panel
Select the Column to edit
Edit the properties of the column either:
via the properties panel or
via the .xls download
Preview results
Schedule selection
Select the type of schedules to show in the selection list below. Either:
Design schedules
Design manual component schedules
Select the schedule to edit. The page will refresh and you can now either:
Edit the schedule properties
Select a column to edit
Edit the schedule via .xls download
Schedule properties
Shows the configured properties for the currently selected schedule, one on each line.
Click to edit the existing property value.
Click to delete the schedule property.
Click to add a new property. Select the property to add from the selector.
Once you are in edit mode for a property, enter the text value you require in
Click or (for edits or new entries) to save changes.
Click to discard edits.
Refer to schedule property definitions for full details of available properties.
Column Selection
Select the column to edit. You can now edit the column properties.
Visible columns are shown listed in yellow, invisible columns are shown listed in white.
Columns are shown listed in their ordinal value. Click the buttons to re-order a column then click to save the changes.
Column properties
Shows the configured properties for the currently selected column, one on each line.
Click to edit the existing property value.
Click to delete the column property (If no delete is shown that is a default column and can't be removed).
Click to add a new property. Select the property to add from the selector.
Once you are in edit mode for a property, enter the text value you require in
Click or (for edits or new entries) to save changes.
Click to discard edits.
Refer to column property definitions for full details of available properties.
.xls Schedule Configuration
a .xls of the currently selected schedule to bulk edit column configurations via Excel. The .xls currently includes a subset of all columns, the most often configured ones, meaning that other columns can only be edited via the column properties panel.
Each schedule column is listed as a row in the .xls, while the editable values are shown in the columns.
The first column of the Excel is the BIMXtra Column System name and can't be edited. It is also a reserved word for UserFiendlyName configuration which means that none of these values can be used as user customised names for any other column.
The rest of the Excel columns then show the property values for each of those column properties and these are the values that can be configured as required. Save and close the Excel when complete.
Click to select and upload your .xls file. The file will be checked and processed when uploaded into BIMXtra.
When the file has been processed a message will be added to the notifications tab:
It may return:
a success if everything processed successfully
a warning if the changes passed validation but issues that may affect schedule performance are detected (for example if the project is set to RIBA stage 3 and a column is set to stage 4, you will not be able to see the column until the project has been set to stage 4.
an error if there are issues in the sheet that need to be addressed before the changes can be accepted. If this occurs you will need to correct the highlighted columns and reupload the sheet.
To view the details of the error click on the word here and a text file will be downloaded with the content of the issues to be reviewed.
The message text provides validation details:
Validate if column is set to Visibile True and a Ribastage greater than the projects current ribastage if a column fails this check then the import will continue but a warning message will be provided.
Note that changes are not applied if errors are encountered.
Each .xls download includes information that defines the project and schedule that it was produced from. Therefore, it is simplest to download a .xls for each schedule you require from each project you are working with.
Refer to Project Configuration > Design Schedule for details of copying all schedule configurations between projects. This method should be used in first preference but is limited by copying all schedule configurations.
Preview Schedule Layout
Select the Project LOD Stage and click to preview the selected schedule configuration. All columns are shown in this preview mode including Design, OM, RC etc. and this is therefore a view that is not necessarily available in other areas of the system. The specifics of this are obviously determined by your configuration.
Schedule Disciplines
Click on the Schedule Discipline column to edit the set of Disciplines in the project, where you can edit existing entries and add new ones. You can only delete Disciplines with no schedules in them.
Schedule property definitions
Schedule properties control the behaviour and appearance of the schedule itself. They are set individually on each schedule to be configured.
CollectionAlternativeName
The name to be used for the schedule, overriding the default name. Can also be edited via the Metadata page.
CostPlanQuantityColumn
??
DefaultSort
??
GroupByColumn
Columns to group the schedule on. Can also be set via the Schedule Grouping panel.
GroupBySelectColumn
The definition of the extra system columns shown when the schedule is grouped.
GroupBySelectColumnFormat
The configuration of GroupBySelectColumn
GroupingEnabled
?? Does not change with UI edit
ScopeSheetQuantityColumn
??
FrozenColumnCount
??
ExportGroupByColumn
?? Does not set with UI edits
Column property definitions
Column Properties control the behaviour and appearance of the schedule columns. They are set individually on each column of each schedule to be configured.
Align
Controls the position of the value in the cell. Valid property values are:
Left
Centre
Right
Default
AuditGrouping
??
AuditPriority
Controls which column has the priority to return results when the audit history is requested by a user. Valid property values are:
Low
Normal
High
CadImport
Sets the column to be mapped from the CAD model imports if TRUE. Sets the column to be a manual edited field if FALSE.
Calculated
??
ClientScript
??
CostPlanGroup
Sets whether the column can be grouped in the Cost Plan section of BIMXtra as displayed in the name column within Cost Plan for that schedule. Valid Property values equal Yes, No.
DatabaseExpression
??
DataTooltip
??
DefaultValue
??
Discipline
Sets the area of BIMXtra the column will first appear, from Design to O&M. Valid Property values are:
Blank - Leave blank for 'Design'
RC
OandM
PreCon
DisplayOverride
??
ExcelFormat
??
Expression
??
HdrLevel0
A text value that's displayed in the column header 0 in the schedule view.
HdrLevel1
A text value that's displayed in the column header 1 in the schedule view.
HdrLevel2
A text value that's displayed in the column header 2 in the schedule view.
HdrLevel3
A text value that's displayed in the column header 3 in the schedule view.
IFCPropertySet
Sets the IFC Property Set that the column is grouped into by the Insight IFC Exporter.
ImportTags
used for Fuzzy Match Mapping - not currently enabled for columns
MaxLength
A whole number that sets the maximum string length that can be entered and saved in this column's cells. Input values larger that the set value will be truncated.
There is a system wide limit on all columns of 1000 characters, and a MaxLength value over this will be ignored with the system limit used instead.
Ordinal
A whole number that sets the position of a column in the schedule. Ordinal 0 is the left edge and the number increases to the right. It is normal to increases the ordinal value in steps (e.g. steps of 10) and therefore leave room for inserting columns and editing later on.
ReadOnly
Sets a column to be read only (non-editable) with the value TRUE or editable with the value FALSE, via the .xls download. If the cell is ready only it will appear with a blue background in the detailed schedule view.
RibaStageId
This controls whether the column is visible based on the project PoW LOD setting. For the column to appear RibaStageId <= Project Pow LOD. Valid Property values are 0, 1, 2, 3, 4, 5.
Round
A whole number rounding value of a number column. e.g. Round of 2, has 2 decimal places.
SupportedDocumentsColumn
??
UseInConstruction
??
UserFriendlyName
Sets the name of the column when it appears in the Mapping screen, Insight and Onsite object data panels. If the Use Friendly Location Names option is on then this value is also shown in Forms and in the Construction Detail Page. This is a free text value, however refer to Reserved UserFriendlyName for details of reserved words that can't be used.
Validation
??
ValidationRule
The definition of the validation rule to check the value of the cell on Model Mapping Import and .xls upload. Values which don't meet the criteria of the rule will be highlighted in red text. This definition is a text field of valid java script. Please see validation rules for further details.
Visible
Sets whether the column is visible and therefore active or not. Valid property values are TRUE or FALSE.
Width
A whole number that sets the width of the column in the schedule view.
Validation Rules
Super users can apply validation rules to schedule columns in the schedule configuration area. The column values are checked against the validation rules on every Model Mapping Import and .xls upload. Any values that do not comply with the column rules are highlighted red with a total of non-compliant values shown on the design landing page. The validation rule is written in Java Script and entered in the ValidationRule property to enter rules for schedule columns.
Below are a few example validation rules that can be easily modified to suit your required values:
Value must be between two bounding values:
x >= 1800 && x <= 2100
Value must match one from a list:
x == '30' || x == 'FD30' || x == '60'
Value must match a specific value:
x == 'Ground'
Value must match one from a list or be between two values
x == 'n/a' || x >= 22 && x <= 55
Check a value contains particular text
EG: Look for an @ symbol in the value:x.indexOf('@') !== -1
Material curve configuration
BIMXtra material curves are calculated using:
- The Material column in every schedule, to specify the material to calculate, and
- Either:
- The schedule column used for the unit of measure quantity calculations, or
- A count of the schedule rows used for number quantity calculations
Refer to the following table for the schedule unit of measure configuration:
Schedule name | Unit of measure |
Actuated Damper | Numbers Of (Count of Schedule Rows) |
Actuated Valve Body | Numbers Of (Count of Schedule Rows) |
Air Handling Unit | Numbers Of (Count of Schedule Rows) |
Air Volume Control Device | Numbers Of (Count of Schedule Rows) |
Anchors | Numbers Of (Count of Schedule Rows) |
Ancillaries | Numbers Of (Count of Schedule Rows) |
Attenuator | Numbers Of (Count of Schedule Rows) |
Blowers | Numbers Of (Count of Schedule Rows) |
Boiler | Numbers Of (Count of Schedule Rows) |
Bridge Paint | Numbers Of (Count of Schedule Rows) |
Bridge Structural Element | Mass (Schedule Column) |
Bridge Survey Defect | Numbers Of (Count of Schedule Rows) |
Builderswork | Numbers Of (Count of Schedule Rows) |
Catchpits | Numbers Of (Count of Schedule Rows) |
Ceiling | Area (Schedule Column) |
Ceiling Finishes | Area (Schedule Column) |
Chilled Beam | Length (Schedule Column) |
CHP | Numbers Of (Count of Schedule Rows) |
Commercial Manual Components | Numbers Of (Count of Schedule Rows) |
Commissioning | Numbers Of (Count of Schedule Rows) |
Communication | Numbers Of (Count of Schedule Rows) |
Concrete Roads | Length (Schedule Column) |
Condensate Pot | Numbers Of (Count of Schedule Rows) |
Construction Navigation Points | Numbers Of (Count of Schedule Rows) |
Containment Fitting | Numbers Of (Count of Schedule Rows) |
Containment Length | Length (Schedule Column) |
Control Panel | Numbers Of (Count of Schedule Rows) |
Cooling Coil | Numbers Of (Count of Schedule Rows) |
Cost Estimate Manual Adjustment | Numbers Of (Count of Schedule Rows) |
Coving Finishes | Numbers Of (Count of Schedule Rows) |
Culvert | Numbers Of (Count of Schedule Rows) |
Curtain Wall | Area (Schedule Column) |
Damper Actuator | Numbers Of (Count of Schedule Rows) |
DDA Equipment | Numbers Of (Count of Schedule Rows) |
Demolitions & Abnormals | Numbers Of (Count of Schedule Rows) |
Design Manual Components | Numbers Of (Count of Schedule Rows) |
Design Navigation Points | Numbers Of (Count of Schedule Rows) |
Detector Loop | Numbers Of (Count of Schedule Rows) |
Distribution Equipment | Numbers Of (Count of Schedule Rows) |
Door | Numbers Of (Count of Schedule Rows) |
Drainage Run | Length (Schedule Column) |
Drainage Runs | Numbers Of (Count of Schedule Rows) |
Ductwork Fitting | Numbers Of (Count of Schedule Rows) |
Ductwork Insulation | Length (Schedule Column) |
Ductwork Length | Length (Schedule Column) |
Ductwork Termination | Numbers Of (Count of Schedule Rows) |
Earthworks | Volume (Schedule Column) |
Electrical Capital Plant | Numbers Of (Count of Schedule Rows) |
Elevated Slabs | Volume (Schedule Column) |
Embedded Retaining Wall | Area (Schedule Column) |
Emergency Telecom Equipment | Numbers Of (Count of Schedule Rows) |
Environmental Hazard Markers | Numbers Of (Count of Schedule Rows) |
Environmental Markers | Numbers Of (Count of Schedule Rows) |
Equipment | Numbers Of (Count of Schedule Rows) |
Exclusion Zones | Numbers Of (Count of Schedule Rows) |
Exhaust Stack | Numbers Of (Count of Schedule Rows) |
Expansion Equipment | Numbers Of (Count of Schedule Rows) |
External Door | Numbers Of (Count of Schedule Rows) |
External Items | Numbers Of (Count of Schedule Rows) |
External Luminaire | Numbers Of (Count of Schedule Rows) |
External Wall | Area (Schedule Column) |
External Window | Numbers Of (Count of Schedule Rows) |
External Works | Numbers Of (Count of Schedule Rows) |
Families | Numbers Of (Count of Schedule Rows) |
Fan | Numbers Of (Count of Schedule Rows) |
Fan Coil and Induction Unit | Numbers Of (Count of Schedule Rows) |
Fencing and Barriers | Numbers Of (Count of Schedule Rows) |
Filter (HVAC) | Numbers Of (Count of Schedule Rows) |
Filter (Pipe) | Numbers Of (Count of Schedule Rows) |
Final Outlet | Numbers Of (Count of Schedule Rows) |
Fire and Safety Alarm | Numbers Of (Count of Schedule Rows) |
Fire and Smoke Damper | Numbers Of (Count of Schedule Rows) |
Floor Finishes | Area (Schedule Column) |
Flow Device | Numbers Of (Count of Schedule Rows) |
Flow Grid | Numbers Of (Count of Schedule Rows) |
Footpath | Length (Schedule Column) |
Foundations | Volume (Schedule Column) |
FST PST Tank | Numbers Of (Count of Schedule Rows) |
Furniture, Fixtures and Fittings | Numbers Of (Count of Schedule Rows) |
Glazed Screen | Numbers Of (Count of Schedule Rows) |
Gravity Retaining Wall | Area (Schedule Column) |
Ground Bearing Slabs | Volume (Schedule Column) |
Gully | Numbers Of (Count of Schedule Rows) |
H&S Hazard Markers | Numbers Of (Count of Schedule Rows) |
Heat Emitter | Numbers Of (Count of Schedule Rows) |
Heat Exchanger | Numbers Of (Count of Schedule Rows) |
Heat Transfer Equipment | Numbers Of (Count of Schedule Rows) |
Heating Coil | Numbers Of (Count of Schedule Rows) |
Humidifier | Numbers Of (Count of Schedule Rows) |
HVAC Capital Plant | Numbers Of (Count of Schedule Rows) |
HVAC Parameter Gauge | Numbers Of (Count of Schedule Rows) |
Inlet Screen | Numbers Of (Count of Schedule Rows) |
Insitu Beams | Volume (Schedule Column) |
Insitu Columns | Volume (Schedule Column) |
Insitu Walls | Volume (Schedule Column) |
Interfaces | Length (Schedule Column) |
Kerbs | Numbers Of (Count of Schedule Rows) |
Key Hazard Markers | Numbers Of (Count of Schedule Rows) |
Level Device | Numbers Of (Count of Schedule Rows) |
Levels | Numbers Of (Count of Schedule Rows) |
Lifting Equipment | Numbers Of (Count of Schedule Rows) |
Lighting Control | Numbers Of (Count of Schedule Rows) |
Linear Distribution Equipment | Numbers Of (Count of Schedule Rows) |
Luminaire | Numbers Of (Count of Schedule Rows) |
Manholes | Numbers Of (Count of Schedule Rows) |
Manual Damper | Numbers Of (Count of Schedule Rows) |
Manual Valve | Numbers Of (Count of Schedule Rows) |
Material Wastage | Numbers Of (Count of Schedule Rows) |
Mechanical Plant Drive | Numbers Of (Count of Schedule Rows) |
Mixers | Numbers Of (Count of Schedule Rows) |
Moisture Device | Numbers Of (Count of Schedule Rows) |
O&M | Numbers Of (Count of Schedule Rows) |
Odour Control Unit | Numbers Of (Count of Schedule Rows) |
Operator Workstation | Numbers Of (Count of Schedule Rows) |
Penstocks & Stop Logs | Numbers Of (Count of Schedule Rows) |
Pile Foundations | Length (Schedule Column) |
Pipework Capital Plant | Numbers Of (Count of Schedule Rows) |
Pipework Fitting | Numbers Of (Count of Schedule Rows) |
Pipework Insulation | Length (Schedule Column) |
Pipework Length | Length (Schedule Column) |
Pipework Parameter Gauge | Numbers Of (Count of Schedule Rows) |
Plant or Equipment | Numbers Of (Count of Schedule Rows) |
Plenum Box | Numbers Of (Count of Schedule Rows) |
Precast Concrete Elements (manual) | Numbers Of (Count of Schedule Rows) |
Pressure Device | Numbers Of (Count of Schedule Rows) |
Pressurisation Equipment | Numbers Of (Count of Schedule Rows) |
Process Valve | Numbers Of (Count of Schedule Rows) |
Procurement | Numbers Of (Count of Schedule Rows) |
Procurement Estimate | Numbers Of (Count of Schedule Rows) |
Protection | Numbers Of (Count of Schedule Rows) |
Public Address System | Numbers Of (Count of Schedule Rows) |
Pump | Numbers Of (Count of Schedule Rows) |
Railing | Numbers Of (Count of Schedule Rows) |
Rebar | RebarTonnage (Schedule Column) |
Road | Length (Schedule Column) |
Road Earthworks | Numbers Of (Count of Schedule Rows) |
Road Layers | Numbers Of (Count of Schedule Rows) |
Road Lighting | Numbers Of (Count of Schedule Rows) |
Road Markings | Numbers Of (Count of Schedule Rows) |
Road Restraint | Numbers Of (Count of Schedule Rows) |
Road Signs | Numbers Of (Count of Schedule Rows) |
Roofing | Area (Schedule Column) |
Rooflight | Numbers Of (Count of Schedule Rows) |
Room | Area (Schedule Column) |
Room Data Sheet (Reqd) | Area (Schedule Column) |
Room Data Sheet As Required | Area (Schedule Column) |
Room HVAC Air Balance | Numbers Of (Count of Schedule Rows) |
Sanitary Fittings and Appliances | Numbers Of (Count of Schedule Rows) |
Scaffolding | Length (Schedule Column) |
Screenings Handling | Numbers Of (Count of Schedule Rows) |
Secondary Steelwork | Length (Schedule Column) |
Security | Numbers Of (Count of Schedule Rows) |
Self Acting Valve | Numbers Of (Count of Schedule Rows) |
Service Chambers / Duct Boxes | Numbers Of (Count of Schedule Rows) |
Service Run | Length (Schedule Column) |
Signage | Numbers Of (Count of Schedule Rows) |
Signal Interface | Numbers Of (Count of Schedule Rows) |
Site Establishment | Numbers Of (Count of Schedule Rows) |
Skirting Finishes | Numbers Of (Count of Schedule Rows) |
Slab and Topping | Volume (Schedule Column) |
Slope Stability Works | Numbers Of (Count of Schedule Rows) |
Small Power System | Numbers Of (Count of Schedule Rows) |
Sprayed Concrete | Numbers Of (Count of Schedule Rows) |
Stair | Numbers Of (Count of Schedule Rows) |
Structural Columns | Volume (Schedule Column) |
Structural Frame | Volume (Schedule Column) |
Structural Gantry | Numbers Of (Count of Schedule Rows) |
Structural Masts | Numbers Of (Count of Schedule Rows) |
Structural Panel | Volume (Schedule Column) |
Structural Parapets | Numbers Of (Count of Schedule Rows) |
Structural Precast Elements | Volume (Schedule Column) |
Structural Wall | Area (Schedule Column) |
Supply and Extract Air Terminal | Numbers Of (Count of Schedule Rows) |
Tank and Pressure Vessel | Numbers Of (Count of Schedule Rows) |
Technology Sign and Signal | Numbers Of (Count of Schedule Rows) |
Temperature Device | Numbers Of (Count of Schedule Rows) |
Temporary Works | Numbers Of (Count of Schedule Rows) |
Termination | Numbers Of (Count of Schedule Rows) |
Traffic Management | Numbers Of (Count of Schedule Rows) |
Unmapped Components | Numbers Of (Count of Schedule Rows) |
User Interface | Numbers Of (Count of Schedule Rows) |
Valve | Numbers Of (Count of Schedule Rows) |
Valve Actuator | Numbers Of (Count of Schedule Rows) |
Wall | Area (Schedule Column) |
Wall Finishes | Numbers Of (Count of Schedule Rows) |
Window | Numbers Of (Count of Schedule Rows) |
Work Zone Equipment | Numbers Of (Count of Schedule Rows) |
Revisions menu
The Revisions menu shows the schedule revisions that have been created on the project.
The Approved column shows the approval status of the schedule, according to any schedule approvers set up on the project. Any schedule revisions pending approval are shown as not approved and will appear in the approvals queue.
Use the Delete button to delete that particular revision of a schedule. An 'Info' toaster message will pop-up to confirm the Schedule Revision deleted.
Customisation menu
The metadata menu shows the schedule type configurations, where the Schedule Names and Disciplines can be configured by clicking
Schedule Customisations can also be copied from other projects using the Copy Schedules tool of the Project Configuration.
Click to edit the schedule Name and Discipline